1. Location of the Industrial Zone / Economic Zone: Vinh Linh District, Quang Tri Province
2. Scale of the Industrial Zone / Economic Zone: Total planed land area is 399.36ha ([i]); including:
  • Area A: 200.95ha, with rent land area of 118.58ha.
  • Area B: 138.41ha, with rent land area of 97.04ha.
3. General infrastructure of the Industrial Zone / Economic Zone:
 
- Internal traffic system: The Industrial Park’s main road has two lanes with lane width of 11.25m; Internal road: including 3 routes (2 with road width of 11.25m, The Northwest Ho Xa Industrial Park has not been invested in infrastructure construction. Currently, the Province is calling for investors to build and operate the Industrial Park infrastructure.
4. Current operation status There are 05 registered investment projects with a total investment capital of VND 258 billion, all of them are under construction. The rent land area is 14.83ha.
  • The area of invested land to build plants: 8.8ha in Area A, accounting for 7.42%; 10.07 ha in Area B, accounting for 10.38%.
  • The remaining area of land for rent: 109.78ha in Area A, accounting for 92.58%; 89.97 ha in Area B, accounting for 89.62%.
     
5. Distance to the nearest seaports 35km far from Cua Viet port, 170km far from Chan May port, 203km far from Da Nang port.
6. Active major investors Shaiyo AA Co., Ltd (Thailand)
7. Population of Neighborhoods (2015) (1) - Measured by radius distance from Industrial Zone/ Economic Zone: The population of Vinh Linh District was about 86,984. (About 12 km far from the Industrial Park).
8. Forms of land lease (Lease term and method of land rental payment). - Forms of land lease: Leasing land with the collection of land use levy; 
- Lease term is 50 years; 
- Method of land rental payment: Annual or one - off payment for the whole project operation period.
9. Construction density (%) - Maximum construction density: 60%; 
- Minimum tree density: 20%; 
- Infrastructure and transportation: rest of land area.
10. Land rent price(2) Land rent rate: VND 180,000/m2/year x 0.85% x 01 time = 1,530 VND /m2/year
11. Other management fees in the Industrial Zone (annual): Infrastructure user fee: from 20 million VND/ha/year. Not applied yet.
12. Capacity of water supply for production and daily life (m3/24h) - Area A is supplied by the Ho Xa water plant which is 4km far from the Industrial Park.
- Area B is supplied by the water plant of Ben Quan township which is 10km far from the Industrial Park.
- Besides, raw water could be taken from Bao Dai lake which is 13km far from Area A, 8km far from Area B, with the capacity of 16,000 m3/day and night
13. The unit price of clean water for production and daily life (VND / m3 ) (3) + For material production activities: 12,500 VND/ m3; 
+ For living activities: 7,200 VND/ m3.
14. Power capacity Power supply system: the 110 KV Dong Ha - Vinh Linh - Dong Hoi overhead line ensures sufficiently the power demand of the plants’ operation.
15. The unit price of electricity for production (VND / kWh) (4) Routine hours: 1,518 VND/ kWh; 
Low-demand hours: 983 VND/ kWh; 
High-demand hours: 2,735 VND/ kWh.
16. Capacity of wastewater treatment plant; Waste water treatment fee (USD / m3 ); Treatment conditions No wastewater treatment plant was built.
17. Preferential policies for investors (enterprise income tax ([i] ), land rental ( [ii] ) (7), import tax (), personal income tax (9) , provincial support policies (10 )  1. Enterprise income tax: 
The enterprise income tax rate is 10% for a period of 15 years. The duration of preferential 
tax rate application is continuously counted from the first year when enterprise starts to generate income from new investment project.  
It is tax - free for 4 years and 50% tax reduction in the next 9 years for the income from new investment projects. The duration of tax exemption and reduction is continuously calculated from the first year of generating taxable income from new investment projects with tax incentives. In the case of having no taxable income for the first three years from the first year of generating income from new investment projects, the tax exemption and reduction duration will be calculated from the fourth year. 

2. Incentives on land rent:
- Land rental shall be exempted for the capital construction period which must not exceed 3 years counting from the date of issuance of the land lease decision of a competent state agency. 
After the period of capital construction during which land rental is exempted, land rental shall be further exempted as follow:
- For 15 years, for investment projects outside the list of sectors eligible for investment incentives.
- For 19 years, for projects on the list of sectors eligible for investment incentives.
- For projects not included in the List of investment incentive sectors, the exemption of land rental will be applied for 15 years after general construction period with land rental exemption. 

- Land rental shall be exempted for the entire lease period for investment projects on the list of sectors eligible for special investment incentives (except investment for construction and commercial operation of infrastructure in functional sub-zones in economic zones).
3. Import  and export tax: 
Import tax exemption is applied for goods imported to create fixed assets, including: 
- Machinery, equipment; components, details, knocked-down parts and spare parts for assembly in complete sets or used in synchronization with machinery and equipment; materials and supplies used for the manufacture of machinery, equipment or for the manufacture of components, details, knocked - down parts and spare parts of machinery and equipment; 
- Means of transport used exclusively in technological lines for direct use in production activities of the project; 
- Construction materials cannot be produced domestically. 
4. Personal income tax
To reduce by 50% of taxable income for taxpayers, including both Vietnamese and foreign workers in economic zones. 
5. Vocational training support: 
Projects hiring over 50 laborers or over 30 female laborers or laborers from ethnic minorities hired in Quang Tri and having labor contracts and social insurance contributions will be provided with a one-time training fee of 1,000,000 VND per laborer for primary vocational training and 3,000,000 VND per laborer for intermediate vocational training or laborer at least using modern technology.
18. Health insurance, social insurance, unemployment insurance policy (11) Total contributions are 34.5%, including: 
- Social insurance accounting for 26%: Employers pay 18%, employees pay 8%. 
- Health insurance accounting for 4.5%: Employers pay 3.5%, employees pay 1%. 
- Unemployment Insurance accounting for 2%: Employers pay 1%, employees pay 1%. 
- Trade Union's dues accounting for 2%: Employers fully pay.
([i]) According to Decision No. 2256/QD-BCT dated March 12th, 2015 of the Ministry  of Industry and Trade on Regulations On Electricity Price;
([ii]) According to Decree No. 218/2013 / ND-CP dated December 26th, 2013 of the Government detailing and guiding the implementation of the Law on Corporate Income Tax;
([iii]) According to Decree No. 46/2014 / ND-CP dated 15th May 2014 of the Government on the collection of land rents and water surface rents; 
(7) According to Decree No. 35/2017 / ND-CP dated April 3rd, 2017 of the Government regulating the collection of land use fee, land rent, water surface rent in the economic zones and high - tech zones; 
(8)  According to the Law on Export and Import Taxes No. 107/2016 / QH13 dated April 6rd, 2016; 
(9) According to Decree No. 29/2008 / ND-CP dated March 14th, 2008 of the Government on industrial zones, export processing zones and economic zones; 
(10) According to Decision No. 39/2016 / QĐ-UBND dated September 21st, 2016 of the Quang Tri Provincial People's Committee promulgating regulations on preferential and supporting investment policies in Quang Tri Province; 
(11)According to the Decision No. 959 / QD-BHXH dated September 9th, 2015 of the Vietnam Social Insurance promulgating regulation on management of social insurance, health insurance and unemployment insurance; social insurance records, health insurance card.

Some pictures of the South Dong Ha Industrial Park
1 5
Planning Map – Area A
2 3
Planning Map – Area B
  Contacts:

Quang Tri Department of Planning and Investment
34 Hung Vuong Street, Dong Ha City, Quang Tri
Tel: (+84) 0233 3852 529
Fax: (+84) 0233 3851 760
Website: http://dpiquangtri.gov.vn 

Quang Tri Economic Zone Administration
91 Le Duan, Dong Ha, Quang Tri
Tel: (+84) 0233 3609 300
Fax: (+84) 0233 3851 743
Website: http://bqlkkt.quangtri.gov.vn

Ongoing Projects in Quang Tri South East Economic Zone:
 
1. Shaiyoo AA – Quang Tri Woodchips and Wood Products Processing Factory
- Investor: Shaiyoo AA – Quang Tri Forestry Products Co., Ltd Quang Tri
- Target: Producing 80,000 tons of woodchips per year, 30,000 tons of wood pellet per year
- Area: 50.000m2
- Investment capital: 94,752,285,000 VND
 
2. The charcoal from waste husk Production Factory.
- Investor: Ho Nghia An Single - Member Limited Liability Company
- Target: Producing charcoal from waste husk with capacity of 8,000 tons of products per year
- Area: 4.630 m2
- Investment capital: 9,849,428,000 VND
 
3. Refined Titanium Processing Factory
- Investor: Quang Tri Minerals Joint Stock Company
- Target: Production of materials for Ilmenite further processing and Zicon crushing
- Area: 45.027 m2
- Investment capital: 70,000,000,000 VND
 
4. Truong Son QT Construction Materials Factory
- Investor: Truong Son Fresh Concrete Co., Ltd
- Target: Production of 240,000 tons of commercial concrete and concrete components per year
- Area: 42.300 m2
- Investment capital: 64,015,926,000 VND
 
5. The Northwest Ho Xa Industrial Park General services Station
- Investor: Truong Danh Joint Stock Company
- Target: Providing petroleum, general trading, warehouses services
- Area: 6.321 m2
- Investment capital: 20,000,000,000 VND

Total notes of this article: 0 in 0 rating

Click on stars to rate this article

  Reader Comments

Older articles

   
 
   
 
You did not use the site, Click here to remain logged. Timeout: 60 second